Colorado Springs New Homes Building Process Phase 4 - Excavation and Construction

Phase 4 is where the excitement begins.  With the lot staked and cleared, the excavation and construction can begin.


Construction Begins

We've done all of our planning and we and we are ready to break ground. We establish the foundation, retaining walls and interior flatwork while preliminary work begins on plumbing. Additionally, we order any items that require a long lead time for production, like windows. 

• Excavation
• Open Hole Inspection
• Order Windows
• Pour Foundation
• Waterproof and Drain
• Sewer and Water Stub
• Backfill
• Retaining Walls
• Plumbing Base
• Interior Flatwork