Colorado Springs Home Building Process Phase 5 - Framing

Phase 5 of the building process is where the exciting part of the construction begins.  Activities that occur during this stage include:

• Framing
• Fireplace install
• Roof Dry In
• Gutter and Downspouts
• Window Install
• Plumbing Rough
• Mechanical Rough
• Plumbing and Mechanical Inspection
• Electrical Walk Through
• Electrical Rough
• Electrical Inspection
• Electrical Service
• Garage Doors Installed
• Stucco/Masonry Lathe
• Phone/AV/Cable Wiring
• Radiant Tube Install (if applicable)
• Pour Lightweight concrete (if applicable)
• Frame Inspection
• Insulation
• Insulation Inspection
• Drywall
• Shelving
• Stucco Brown Coat
• Paint Exterior
• Masonry Exterior

>>Go to Phase 6

About Homes by Michael Hall

Colorado Springs Home Builder Mike Hall has been building homes in Colorado Springs and the Pikes Peak region for over 20 years. His extensive knowledge of every aspect of the building process from lot selection and design to the completion of the final product makes him a wise choice.

Search for Land

Sort by area, acreage, school district and more. Visit our Land Search.

© 2017 Homes by Michael Hall. All Rights Reserved. Designed By SpringsHomes.com

Search