Contact Us
  • Register
Home  /  Process  /  Phase 5 - Framing Begins
PDF
Print
E-mail

Colorado Springs New Homes Building Process Phase 5 - Framing


Phase 5 of the building process is where the exciting part of the construction begins.  Activities that occur during this stage include:

 

• Framing
• Fireplace install
• Roof Dry In
• Gutter and Downspouts
• Window Install
• Plumbing Rough
• Mechanical Rough
• Plumbing and Mechanical Inspection
• Electrical Walk Through
• Electrical Rough
• Electrical Inspection
• Electrical Service
• Garage Doors Installed
• Stucco/Masonry Lathe
• Phone/AV/Cable Wiring
• Radiant Tube Install (if applicable)
• Pour Lightweight concrete (if applicable)
• Frame Inspection
• Insulation
• Insulation Inspection
• Drywall
• Shelving
• Stucco Brown Coat
• Paint Exterior
• Masonry Exterior


 

 

 

Contact Us


Fill out this form for more information about Homes by Michael Hall.

Full Name (*)

Please type your full name.
E-mail (*)

Invalid email address.
Phone

Invalid Input
Contact preference?


Message

Invalid Input


  Refresh
Invalid Input

  

Login



User Registration

*
*
*
*
*

Fields marked with an asterisk (*) are required.